Renovation in Leduc

In this renovation job we were asked to set 12×24 tile in a 70/30 staggered pattern for both the floor and the tub. For the tub surround we installed a 4″ mosaic insert on the top of the jacuzzi splash, we well as on the 3″ mosaic insert on the tub skirt. The jacuzzi was set using VersaBond Thin-Set  and the floor was set using 253 Gold Laticrete Thin-Set. The bathroom was grouted using a high performance, stain resistant Prism Grout.

10592906_685814138173274_759148484164685783_n

10610655_685814191506602_7284703196512583524_n 1380558_685814164839938_2328664883665718758_n

Request An Estimate

Are you looking to get an estimate? This form will help us predetermine the amount of work prior to coming to your house / job site to see the work you want done. Please fill out the form below as accurately as you are able to and we will contact you as soon as possible.

"*" indicates required fields

Name*
Drop files here or
Accepted file types: jpeg, heic, pdf, Max. file size: 64 MB, Max. files: 10.
    More details to share?